top of page

The Process and Timeline of a Bathroom Renovation & How to Find Quality Trades

Writer: Thomas WalkerThomas Walker

Updated: Feb 5

A bathroom renovation is one of the most rewarding home improvement projects, enhancing both functionality and home value. However, it’s also a complex process that requires careful planning, skilled trades, and a realistic timeline. Whether you’re updating a tired bathroom or doing a complete overhaul, understanding the renovation process and finding quality tradespeople is key to achieving a stunning and long-lasting result. Let’s break down the step-by-step process, estimated timelines, and how to hire top professionals like Vivid Living Renovations for a smooth and stress-free renovation.



Pre-Renovation Planning

1. Define Your Budget & Scope of Work

  • Determine how much you’re willing to spend.

  • Decide if it’s a full remodel or just minor updates.

  • Consider factors like new plumbing, tiling, or structural changes.

2. Choose a Design & Layout

  • Think about space optimization and functionality.

  • Decide between a modern, classic, or luxury design.

  • Ensure proper ventilation, lighting, and storage solutions.

3. Select Materials & Fixtures

  • Choose durable tiles, vanities, bathtubs, and tapware.

  • Consider water-efficient fixtures to save on bills.

  • Get professional recommendations for waterproofing and long-lasting materials.


The Bathroom Renovation Process & Timelines

A bathroom renovation typically takes 2–4 weeks, depending on the project’s complexity. Below is a step-by-step breakdown of the process.


Step 1: Demolition & Preparation (1–2 Days)

  • Old tiles, fixtures, and fittings are removed.

  • Walls and floors are inspected for damage.

  • Any structural modifications (e.g., moving walls) are completed.

Step 2: Plumbing & Electrical Rough-In (2–4 Days)

  • Licensed plumbers and electricians install new pipes and wiring.

  • Relocating sinks, toilets, and lights is done at this stage.

  • It’s crucial to use qualified tradespeople to avoid costly mistakes.

Step 3: Waterproofing & Drying Time (1–2 Days)

  • Waterproofing is applied to floors and walls to prevent leaks.

  • A drying period of 24 hours is required for proper sealing.

Step 4: Tiling & Flooring Installation (3–5 Days)

  • Wall and floor tiles are installed by professional tilers.

  • Grouting and sealing are completed to ensure a perfect finish.

  • Heated flooring (if included) is installed at this stage.

Step 5: Installing Fixtures & Fittings (2–4 Days)

  • Toilets, sinks, showers, and bathtubs are installed.

  • Vanities, mirrors, and cabinets are fitted.

  • Final plumbing and electrical connections are made.

Step 6: Painting & Finishing Touches (1–2 Days)

  • Walls and ceilings are painted.

  • Final detailing is done, such as sealing gaps and installing accessories.

Step 7: Final Inspection & Clean-Up (1 Day)

  • A professional inspection ensures everything is safe and functional.

  • The bathroom is cleaned, polished, and ready for use!



How to Find Quality Tradespeople

What to Look for in a Bathroom Renovation Specialist

  • Licensed & Insured: Ensure they hold the necessary certifications.

  • Experience & Portfolio: Look at past projects and reviews.

  • Clear Communication: Reliable timelines and honest pricing.


Why Choose Vivid Living Renovations?


If you’re looking for high-quality bathroom renovations in Central Coast, NSW, we highly recommend Vivid Living Renovations. With over 10 years of experience, they specialize in modern and stylish bathroom remodels, ensuring top-tier craftsmanship and attention to detail.


📍 Contact: 0457 254 830

 
 
 

Comments


bottom of page